Frontier Publications
- Present values - the economics of ChristmasBulletin | 14.12.2011.
- A framework for the evaluation of smart gridsA consultation document prepared for OfgemPresentation | 23.11.2011.
- The price is wrongTHE COST OF ELECTRICITY MARKET REFORM IN BRITAINBulletin | 18.10.2011.
- The way to RIIOUSING OUTPUTS IN UK ENERGY NETWORK REGULATIONBulletin | 18.10.2011.
- Pressing the switches Increasing competition in retail bankingBulletin | 05.10.2011.
- Connecting for growthThe role of Britain's hub airport in economic recovery | 22.09.2011.
- English Premium League – Frontier Economics bulletinWhy clubs pay more for English footballersBulletin | 08.09.2011.
- War and peaceThe economic cost of a return to conflict in SudanBulletin | 07.07.2011.
- Target Model for the European Natural Gas MarketA report prepared for GDF Suez branche infrastructuresPresentation | 28.06.2011.
- The £600m clashTHE 2011 CHAMPIONS LEAGUE FINALBulletin | 27.05.2011.
Regulation of Capacity Investment at Stansted Airport
A report commissioned by easyJetThe Civil Aviation Authority is currently consulting on the form of price regulation that should apply to Stansted Airport for the next five years. Frontier's report sets out a proposal designed to reduce the need for regulation at Stansted and increase the scope for competition within the airport by introducing new terminal operators so as to create competition between terminal facilities to provide services to airlines. The report analyses the practical steps needed to implement this proposal and demonstrates the feasibility of this option by drawing on evidence of competitive terminal provision around the world. The report is available here .






